Planning & scheduling
Sales & operations planning (S&OP)
Run the monthly S&OP cycle: refresh the demand plan, test it against capacity and material in the supply review, reconcile gaps with options and their cost, and take one agreed plan to the executive meeting.
- Inputs
- Statistical forecast and sales input · Open orders and backlog · Capacity by work centre · Inventory and targets
- Outputs
- Consensus demand plan · Supply plan with gaps and options · Executive S&OP decisions
- KPIs it moves
- Forecast accuracy · Plan attainment · On-time delivery
- Systems it usually runs on
- APS / supply planning · ERP · BI
- Where a person stays in the loop
- Executive S&OP plan sign-off · Demand override above threshold
Master production schedule & rough-cut capacity
Set what end items are built by week from the S&OP plan and customer orders, check the load on bottleneck work centres, and protect the frozen time fence.
- Inputs
- S&OP plan · Customer orders and forecast · Bottleneck capacity · Finished-goods inventory
- Outputs
- Released master schedule · Available-to-promise by item · Rough-cut capacity load
- KPIs it moves
- Changes inside the frozen fence · Schedule attainment · Finished-goods days of supply
- Systems it usually runs on
- ERP · APS / supply planning
- Where a person stays in the loop
- Change inside the frozen time fence · Overtime, extra shift or outsourcing to cover a capacity gap
MRP run & planner action messages
Work the MRP exception list after each run: release planned orders, and act on expedite, push-out and cancel messages before they become shortages or excess.
- Inputs
- MRP exception messages · Planned orders · Open purchase and production orders · Lead times and lot sizes
- Outputs
- Released purchase and production orders · Rescheduled or cancelled orders
- KPIs it moves
- Material shortages at work order release · Past-due planned orders · Inventory turns
- Systems it usually runs on
- ERP · APS / supply planning
- Where a person stays in the loop
- Cancel an order a supplier has already started · Expedite that needs premium freight
Production scheduling & dispatch
Sequence released work orders on each line or cell by due date, changeover and material availability, issue the dispatch list, and re-sequence when a machine goes down or material is short.
- Inputs
- Released work orders · Line and machine availability · Material availability · Changeover matrix
- Outputs
- Sequenced schedule by line · Dispatch list · Orders at risk of missing due date
- KPIs it moves
- Schedule attainment · Changeover time · Work orders completed on time
- Systems it usually runs on
- MES · APS / supply planning · ERP
- Where a person stays in the loop
- Re-sequence that moves a customer due date
Production & shop floor
Work order release & kitting
Before a work order goes to the floor, check material, tooling, current drawings and routing are ready; pick and stage the kit, and decide whether to release short.
- Inputs
- Scheduled work orders · Material on hand and allocations · Tooling and fixture availability · Current drawing and routing revision
- Outputs
- Released work order with traveller · Staged kit · Shortage list
- KPIs it moves
- Work orders released complete · Kit shortages at the line · Release-to-start time
- Systems it usually runs on
- ERP · MES · WMS
- Where a person stays in the loop
- Release a work order short of material
Labour & machine reporting (production confirmations)
Make sure every operation is confirmed with good quantity, scrap, labour and machine time; catch unreported operations, backflush errors and impossible hours before the shift closes.
- Inputs
- Operator confirmations · Machine counts and run time · Clock-in records · Routing standards
- Outputs
- Corrected confirmations · Unreported-operation list
- KPIs it moves
- Operations confirmed by shift end · Labour efficiency vs standard · Confirmation corrections
- Systems it usually runs on
- MES · ERP · Time capture app
- Where a person stays in the loop
- Correct a confirmation already posted to cost
OEE & downtime loss analysis
Turn machine states and operator downtime codes into availability, performance and quality losses by line; rank the top losses and give each an owner and an action.
- Inputs
- Machine state and counts · Downtime reason codes · Ideal cycle times · Scrap and rework counts
- Outputs
- OEE by line and shift · Top-loss Pareto · Improvement actions with owners
- KPIs it moves
- OEE · Unplanned downtime minutes · Loss actions closed on time
- Systems it usually runs on
- MES · Plant historian / SCADA · BI
- Where a person stays in the loop
- Recode a downtime event to another cause · Assign a loss action to another department
Scrap & rework reporting
Record scrap and rework by part, operation and cause, cost it, post it to inventory, and trend it so repeat causes go to quality or engineering.
- Inputs
- Scrap and rework tickets · Standard cost · Defect codes
- Outputs
- Posted scrap and rework · Scrap cost by cause · Repeat-cause referrals
- KPIs it moves
- Scrap rate · Cost of scrap · Rework hours
- Systems it usually runs on
- MES · ERP · QMS
- Where a person stays in the loop
- Scrap write-off above threshold
Engineering & product introduction
Engineering change order
Assess, approve, and implement an engineering change across BOM, routing, and documentation.
- Inputs
- Change request · Affected BOM/items · Impact analysis
- Outputs
- Approved ECO · Updated BOM/routing
- KPIs it moves
- ECO cycle time · Implementation accuracy · Field-issue rate
- Systems it usually runs on
- PLM · ERP · MES
- Where a person stays in the loop
- CCB approval
Manufacturing BOM & routing maintenance
Build and keep the manufacturing BOM and routing from the engineering release: operations, work centres, standard times and backflush points, checked for missing items and costs.
- Inputs
- Engineering BOM release · Work centres and rates · Time studies
- Outputs
- Released manufacturing BOM · Released routing
- KPIs it moves
- BOM accuracy · Routing hours vs actual · Items released with incomplete data
- Systems it usually runs on
- PLM · ERP · MES
- Where a person stays in the loop
- Release of a new BOM or routing revision to production
New product introduction & stage-gate reviews
Track a new product's deliverables gate by gate — design, validation, pilot build, launch — and prepare the evidence for each gate review: open risks, tooling, cost against target and production readiness.
- Inputs
- Programme plan and gate checklists · Design and validation status · Pilot build results · Target cost
- Outputs
- Gate review pack · Open-risk list · Launch readiness status
- KPIs it moves
- Gates passed on schedule · Launch on date · Product cost vs target
- Systems it usually runs on
- PLM · Project management system · ERP
- Where a person stays in the loop
- Gate decision — go, conditional go or hold
Quality
Quality NCR / CAPA
Route nonconformances, run root-cause, and track corrective/preventive actions.
- Inputs
- Nonconformance · Inspection data
- Outputs
- Disposition · CAPA
- KPIs it moves
- NCR cycle time · CAPA on-time closure · Recurrence rate
- Systems it usually runs on
- QMS · ERP · MES
- Where a person stays in the loop
- Disposition approval
Incoming inspection & receiving quality
Inspect purchased lots to the sampling plan and skip-lot status, check certificates of conformance, and accept, hold or reject before the material reaches stock.
- Inputs
- Goods receipt · Sampling plan and skip-lot status · Certificates of conformance · Drawing and specification
- Outputs
- Inspection result · Lot accepted to stock or held · Nonconformance on rejection
- KPIs it moves
- Incoming lot acceptance rate · Inspection backlog · Supplier PPM
- Systems it usually runs on
- QMS · ERP · Supplier portal
- Where a person stays in the loop
- Accept a lot on a deviation
In-process inspection & SPC
Watch control charts on critical characteristics, flag out-of-control signals and capability drops, and make sure the control plan reaction — contain, adjust, stop — is followed and recorded.
- Inputs
- In-process measurements · Control plan · Control limits and specifications
- Outputs
- Out-of-control alerts · Recorded reaction · Capability by characteristic
- KPIs it moves
- Cpk on critical characteristics · Out-of-control signals with a recorded reaction · First-pass yield
- Systems it usually runs on
- QMS · MES
- Where a person stays in the loop
- Stop the line or contain product on an out-of-control signal
APQP & control plan development
Take a new or changed part through advanced product quality planning: process flow, PFMEA, control plan, measurement system analysis and initial capability, ready for customer PPAP.
- Inputs
- Customer requirements and drawings · Process flow · Special characteristics
- Outputs
- PFMEA · Control plan · MSA and initial capability results
- KPIs it moves
- APQP elements complete at each phase · High-risk failure modes with actions · Customer PPAP approved first time
- Systems it usually runs on
- QMS · PLM · Document store
- Where a person stays in the loop
- Control plan approval · Acceptance of a high-risk failure mode
First article inspection (FAI)
Run a full inspection of the first part from a new part number, revision, process or source: every drawing characteristic ballooned, measured and accounted for, with material and special-process certificates.
- Inputs
- Ballooned drawing · Measurement results · Material and special-process certificates
- Outputs
- FAI report · Nonconforming characteristics
- KPIs it moves
- FAI first-pass rate · FAI cycle time · Characteristics not accounted for
- Systems it usually runs on
- QMS · PLM · ERP
- Where a person stays in the loop
- FAI acceptance sign-off
Customer complaint & 8D
Log a customer complaint or return, contain suspect stock at the plant, in transit and at the customer, and drive the 8D to a root cause and verified fix within the customer's deadlines.
- Inputs
- Customer complaint or return · Lot and shipment history · Customer's response deadlines
- Outputs
- Containment record · 8D report · Customer response
- KPIs it moves
- Customer PPM · 8D steps on time · Repeat complaints
- Systems it usually runs on
- QMS · CRM · ERP
- Where a person stays in the loop
- 8D sign-off before it goes to the customer
Gauge calibration & measurement systems
Keep every gauge on its calibration schedule, pull overdue gauges, and when one is found out of tolerance, work out which product it measured since its last good calibration.
- Inputs
- Gauge register and intervals · Calibration results · Gauge usage history
- Outputs
- Calibration schedule · Out-of-tolerance impact assessment · Gauge R&R results
- KPIs it moves
- Gauges overdue · Out-of-tolerance findings · Gauge R&R %
- Systems it usually runs on
- QMS · MES
- Where a person stays in the loop
- Product impact decision on an out-of-tolerance gauge
Quality system & layered process audits
Plan and run internal quality-system audits and layered process audits on the floor, record findings against the standard, and track corrective actions to closure ahead of certification audits.
- Inputs
- Audit programme · Quality standard and procedures · Layered audit checklists
- Outputs
- Audit findings · Corrective actions · Certification readiness
- KPIs it moves
- Audits completed to plan · Findings closed on time · Major findings at certification audits
- Systems it usually runs on
- QMS · Document store
- Where a person stays in the loop
- Grade a finding major or minor
Traceability & field actions
Lot & serial traceability and genealogy
Trace backward from a finished serial or lot to its component lots, operators and process data, and forward from a suspect component lot to every unit and customer it reached.
- Inputs
- Lot and serial genealogy · Component lot consumption · Shipment history
- Outputs
- Backward and forward trace · Affected units and customers
- KPIs it moves
- Time to complete a trace · Trace completeness · Mock traces passed
- Systems it usually runs on
- MES · ERP · QMS
- Where a person stays in the loop
- Scope of a quality hold from a trace
Product recall & field service campaign
Decide the scope of a field action from the genealogy, notify the regulator and customers where required, and track every affected unit until it is repaired, replaced or recovered.
- Inputs
- Trace result · Hazard assessment · Installed base and customer list
- Outputs
- Field action plan · Regulator and customer notices · Campaign completion by unit
- KPIs it moves
- Units remedied · Days from decision to notification · Cost of the field action
- Systems it usually runs on
- QMS · CRM · Field service · ERP
- Where a person stays in the loop
- Recall or field action decision · Regulator notification
Supplier quality
Supplier PPAP
Collect and review supplier production-part approval submissions.
- Inputs
- PPAP submission · Part specs
- Outputs
- PPAP approval · Rejection with actions
- KPIs it moves
- PPAP approval cycle time · First-pass rate
- Systems it usually runs on
- QMS · Supplier portal
- Where a person stays in the loop
- Quality engineer approval
Supplier corrective action (SCAR)
Issue a corrective action request to a supplier for a nonconformance, chase their containment and 8D, verify the fix on later lots, and recover the cost of the failure.
- Inputs
- Nonconformance traced to a supplier · Supplier 8D response · Cost of the failure
- Outputs
- SCAR · Effectiveness verification · Supplier debit
- KPIs it moves
- SCARs closed on time · Repeat SCARs · Cost recovered from suppliers
- Systems it usually runs on
- QMS · Supplier portal · ERP
- Where a person stays in the loop
- Close a SCAR as effective · Escalate a supplier to controlled shipping
Supplier performance scorecard & review
Score each supplier monthly on quality PPM, delivery and responsiveness, prepare the business review, and put persistent poor performers on a development plan or new-business hold.
- Inputs
- Receipts and rejections · Delivery performance · SCAR history
- Outputs
- Supplier scorecard · Business review pack · Development plan
- KPIs it moves
- Supplier PPM · Supplier on-time delivery · Suppliers on development plans
- Systems it usually runs on
- ERP · QMS · Supplier portal · BI
- Where a person stays in the loop
- Place a supplier on new-business hold
Supplier deviation & change requests
Review a supplier request to ship product that does not meet the drawing, or to change its process, material or site; decide with engineering whether to accept, limit by quantity and date, or require requalification.
- Inputs
- Deviation or change request · Drawing and specification · Risk and validation evidence
- Outputs
- Approved, limited or rejected request · Requalification requirement
- KPIs it moves
- Request turnaround · Deviations open past expiry · Supplier changes found without notice
- Systems it usually runs on
- QMS · Supplier portal · PLM
- Where a person stays in the loop
- Deviation approval · Require a new PPAP for a supplier change
Materials & purchasing
Supplier delivery schedules & releases
Send suppliers the forecast and firm releases against scheduling agreements and blanket orders, get confirmations, and manage changes inside the supplier firm zone.
- Inputs
- MRP requirements · Scheduling agreements and blanket orders · Supplier firm and trade-off zones
- Outputs
- Delivery schedule release · Supplier confirmations · Firm-zone change log
- KPIs it moves
- Supplier on-time delivery · Releases confirmed · Premium freight cost
- Systems it usually runs on
- ERP · EDI · Supplier portal
- Where a person stays in the loop
- Change inside the supplier firm zone
Material shortage & expediting
Keep the hot list of parts short against the schedule, get supplier recovery dates, and choose between expediting, an alternate source, a substitute part or moving the build.
- Inputs
- Shortages against the schedule · Open purchase orders and supplier commits · Approved alternates
- Outputs
- Hot list with recovery dates · Expedite actions · Schedule impact
- KPIs it moves
- Line stoppages for material · Shortages recovered before need date · Premium freight cost
- Systems it usually runs on
- ERP · Supplier portal · Email
- Where a person stays in the loop
- Premium freight above threshold · Use an alternate or substitute part
Contract manufacturing & outside processing
Manage work done by contract manufacturers and outside processors such as plating and heat treatment: subcontract orders, material shipped to them, turnaround and returned quality.
- Inputs
- Subcontract and outside-processing orders · Material shipped to the vendor · Process certificates
- Outputs
- Tracked material at vendors · Receipts back to stock · Vendor turnaround report
- KPIs it moves
- Outside-processing turnaround · Material at vendors past due · Quality escapes from outside processing
- Systems it usually runs on
- ERP · Supplier portal · QMS
- Where a person stays in the loop
- Approve a new outside processor or contract manufacturer
Plant cycle counting & inventory adjustments
Count raw material, WIP and finished goods by ABC class, investigate variances back to unreported scrap, backflush and receiving errors, and post approved adjustments.
- Inputs
- ABC count plan · Count results · System on-hand · Recent transactions
- Outputs
- Variance root cause · Approved adjustments
- KPIs it moves
- Inventory record accuracy · Adjustment value · Counts completed to plan
- Systems it usually runs on
- ERP · WMS · MES
- Where a person stays in the loop
- Inventory adjustment above threshold
Maintenance & reliability
Preventive maintenance
Schedule and dispatch preventive maintenance and capture completion.
- Inputs
- Asset · Maintenance plan · Meter/usage
- Outputs
- Work order · Completion record
- KPIs it moves
- PM compliance % · Unplanned downtime · MTBF
- Systems it usually runs on
- EAM/CMMS · MES
- Where a person stays in the loop
- Shutdown scheduling approval
Maintenance requests & breakdown response
Take requests and breakdown calls from the floor, set the priority by safety and production impact, dispatch a technician, and record failure cause and repair on the work order.
- Inputs
- Maintenance request · Asset criticality · Production impact
- Outputs
- Prioritised work order · Failure and repair record
- KPIs it moves
- Mean time to repair (MTTR) · Response time to breakdowns · Work orders with a failure code
- Systems it usually runs on
- EAM/CMMS · MES
- Where a person stays in the loop
- Emergency priority that interrupts planned work
Maintenance planning & weekly schedule
Plan backlog jobs with labour, parts and permits ready, agree downtime windows with production, publish the weekly schedule and measure how much of it was done.
- Inputs
- Maintenance backlog · Job plans and labour estimates · Parts availability · Production downtime windows
- Outputs
- Weekly maintenance schedule · Ready-to-schedule backlog
- KPIs it moves
- Schedule compliance · Planned work share · Backlog weeks
- Systems it usually runs on
- EAM/CMMS · ERP
- Where a person stays in the loop
- Downtime window agreed with production
Condition-based & predictive maintenance
Watch vibration, temperature, oil and sensor trends on critical plant assets against alarm limits, and raise a work order to fix a developing fault before it fails.
- Inputs
- Condition monitoring readings · Alarm limits · Asset history
- Outputs
- Condition alerts · Predictive work orders
- KPIs it moves
- Failures caught before breakdown · Predictive work orders completed · Unplanned downtime on critical assets
- Systems it usually runs on
- Plant historian / SCADA · IoT platform · EAM/CMMS
- Where a person stays in the loop
- Take a running asset down for a condition-based repair
MRO spare parts & critical spares
Keep maintenance stores stocked by min/max with critical spares protected, reserve parts for planned jobs, and clear obsolete parts for assets that are gone.
- Inputs
- Spare parts on hand · Min/max and criticality · Planned job reservations · Asset register
- Outputs
- Reorder proposals · Critical spares status · Obsolete parts list
- KPIs it moves
- Critical spares stock-outs · MRO inventory value · Jobs delayed for parts
- Systems it usually runs on
- EAM/CMMS · ERP
- Where a person stays in the loop
- Stock a new critical spare · Write off obsolete spares
Environment, health & safety
Plant injury & near-miss investigation
Record injuries, near misses and first-aid cases, decide recordability, investigate root cause, and track corrective actions; keep the injury log current.
- Inputs
- Incident or near-miss report · Witness statements · Treatment details
- Outputs
- Investigation with root cause · Corrective actions · Injury log entry
- KPIs it moves
- Total recordable incident rate · Near misses reported · Corrective actions closed on time
- Systems it usually runs on
- HSE / EHS system · HRIS
- Where a person stays in the loop
- Recordability determination
Lockout/tagout & hazardous work permits
Keep machine-specific lockout procedures current and inspected, and issue and close permits for hot work, confined space and line breaking.
- Inputs
- Machine lockout procedures · Permit requests · Periodic inspection records
- Outputs
- Authorised permits · Inspected lockout procedures · Permit close-out
- KPIs it moves
- Lockout procedures inspected on time · Permits closed out correctly · Lockout violations found
- Systems it usually runs on
- HSE / EHS system · EAM/CMMS
- Where a person stays in the loop
- Permit authorisation
Environmental permits & emissions reporting
Track air, water and waste permit limits against monitoring data, manage hazardous waste shipments, and prepare required reports and deviation notices on time.
- Inputs
- Permit limits and conditions · Monitoring and sampling data · Waste manifests
- Outputs
- Permit compliance status · Regulatory reports · Deviation notices
- KPIs it moves
- Permit exceedances · Reports filed on time · Hazardous waste generated
- Systems it usually runs on
- HSE / EHS system · Plant historian / SCADA
- Where a person stays in the loop
- Certification of a regulatory report
Plant costing
Standard cost roll-up & release
Roll up standard costs from BOMs, routings, labour and overhead rates and purchase prices; investigate items whose cost moved beyond tolerance or rolled to zero, and release new standards.
- Inputs
- BOMs and routings · Labour and overhead rates · Purchase prices · Current standards
- Outputs
- Cost roll-up with changes · Released standards · Inventory revaluation
- KPIs it moves
- Items with cost changes reviewed · Roll-up errors (zero or missing cost) · Inventory revaluation
- Systems it usually runs on
- ERP · BI
- Where a person stays in the loop
- Release of new standard costs
Manufacturing variance analysis
Explain the month: purchase price, material usage, labour efficiency and rate, and overhead absorption variances by plant, line and product, with the operational cause behind each large one.
- Inputs
- Work order variances · Purchase price variances · Absorption and spending
- Outputs
- Variance bridge · Explained variances with owners
- KPIs it moves
- Manufacturing variance % of standard · Unexplained variance · Cost per unit vs standard
- Systems it usually runs on
- ERP · BI
- Where a person stays in the loop
- Correct a standard after a variance review
Work order close & aged WIP review
Close completed work orders and settle their variances to the period, and review open orders with WIP sitting too long or with costs but no activity.
- Inputs
- Completed work orders · Open WIP by order · Order activity dates
- Outputs
- Closed and settled work orders · Aged WIP list
- KPIs it moves
- Completed orders closed in period · Aged WIP value · WIP write-offs
- Systems it usually runs on
- ERP · MES
- Where a person stays in the loop
- Write off WIP on a stalled order
Orders, aftermarket & service
Configure-to-order quote & delivery promise
Check a configured order against product rules, send special requirements to engineering for feasibility and cost, price within margin limits, and commit a delivery date the plant can meet.
- Inputs
- Customer configuration and requirements · Configuration rules · Cost and price lists · Capacity and material availability
- Outputs
- Validated configuration · Quote with committed delivery date · Engineering review for specials
- KPIs it moves
- Quote turnaround · Quote win rate · Orders delivered on the promised date
- Systems it usually runs on
- CPQ · ERP · CRM · PLM
- Where a person stays in the loop
- Price below margin floor · Accept a special that needs engineering
Warranty claim review & supplier recovery
Check dealer and customer warranty claims against coverage, failure codes and returned parts, pay or reject them, and recover the cost from the supplier when their part failed.
- Inputs
- Warranty claim · Coverage terms and serial build date · Returned part analysis
- Outputs
- Paid or rejected claim · Supplier recovery claim · Failure trend
- KPIs it moves
- Warranty cost per unit sold · Claim processing time · Supplier recovery rate
- Systems it usually runs on
- ERP · CRM · QMS
- Where a person stays in the loop
- Goodwill outside warranty · Reject a claim
Repair & return (RMA) depot
Authorise returns of products for repair, receive and evaluate them, quote out-of-warranty repairs, and repair, replace or credit within the promised turnaround.
- Inputs
- Return request · Serial and warranty status · Evaluation findings
- Outputs
- Return authorisation · Repair quote · Repaired, replaced or credited unit
- KPIs it moves
- Repair turnaround · Repair quote acceptance · No-fault-found rate
- Systems it usually runs on
- ERP · CRM · Field service
- Where a person stays in the loop
- Replace instead of repair · Out-of-warranty repair price exception
Field service dispatch & service reports
Schedule technicians to installed equipment by skill, territory and parts availability, capture the service report, and bill it or charge it to warranty or contract.
- Inputs
- Service request · Installed base and contract · Technician skills and calendar · Parts availability
- Outputs
- Scheduled visit · Service report · Billable or warranty charge
- KPIs it moves
- First-time fix rate · Time to respond · Service reports billed within a week
- Systems it usually runs on
- Field service · CRM · ERP
- Where a person stays in the loop
- Bill vs warranty or contract coverage decision
Digital commerce & connected service
Digital CPQ & spare-parts commerce
Configure-price-quote and sell spare parts / aftermarket products online.
- Inputs
- Configuration request · Pricing · Availability
- Outputs
- Quote / order
- KPIs it moves
- Quote turnaround · Quote-to-order rate · Config error rate
- Systems it usually runs on
- CPQ · eCommerce · ERP
- Where a person stays in the loop
- Non-standard config / pricing approval
Connected-asset service request
Triage IoT / asset telemetry alerts into prioritized service work orders.
- Inputs
- Asset telemetry · Service contract
- Outputs
- Service work order
- KPIs it moves
- Mean time to dispatch · First-time fix · Unplanned downtime
- Systems it usually runs on
- IoT platform · EAM/CMMS · Field service
- Where a person stays in the loop
- Warranty / coverage decision
What a blueprint is, and is not
A blueprint supplies the vocabulary, the typical steps, the KPIs and the approval points for a process. It is a starting point, not a pre-built agent: tacitrun builds the domain agents by reading your own procedure, tests them against cases derived from it, runs them in shadow beside your team, and holds every write for a person until the agent has earned autonomy. Your IT connects the systems and approves before anything goes live.
Questions people ask
- How do I give an agent a reference document (e.g. a sample template) to use at runtime?
- Two places, both drag-and-drop: (1) for ONE agent, open it → Knowledge tab → drop the file on “Documents it can look up”; (2) for the WHOLE process (available to every agent in it), the process page has a “Documents for this process” card — drop it there. For example, drop a sample proposal template for a Proposal Generator. Whatever the format — PDF, Word, Excel, CSV, HTML, text, OR a screenshot/image (PNG, JPG, etc.) — we handle it: documents convert to clean markdown (tables and headings preserved, not a flattened blob), and images/screenshots are read by vision (Claude) which transcribes all the text and describes what’s in them (e.g. a screenshot of an invoice becomes a markdown table of its line items). Then we index it so agents find the right passage. It’s added immediately (no IT approval needed, nothing hardcoded) and shows in the document list. From then on the agent searches it live every run and uses it as a reference — e.g. it drafts new proposals in the shape of your template. To have it ALWAYS apply a rule instead of just look it up, use “Teach it” on the same tab (or the Rules tab for enforceable policies).
- What is the Salesforce Data Hygiene blueprint, and how do I use it?
- It’s a pre-built end-to-end process (a "crew" of 5 domain agents) that replaces the manual job of cleaning up messy CRM data and re-importing it. In the Catalog it shows as a Blueprint with the problem it solves, the outcomes it delivers, and the process mapped to each domain agent: (1) Data Quality Auditor profiles the object and reports duplicates/blanks/malformed/stale records; (2) Duplicate Finder & Merger proposes human-approved merges; (3) Field Standardizer normalizes phone/state/country/titles/casing; (4) Data Re-import Loader picks up a cleaned file (SFTP/SharePoint/Drive) and UPSERTS each row by external ID — so re-runs update the same record instead of creating duplicates; (5) Import Reconciliation Auditor verifies the load matched the source. Adopt each step from the blueprint; we build a private copy in your workspace that you can adapt, connected to your own Salesforce. Every write goes through human approval until you trust it.
- What’s a Skill vs a Blueprint?
- A Blueprint is a starter process template. A Skill is a reusable knowledge pack a domain agent loads on demand at runtime.
- Do you have blueprints for private equity / deal teams?
- Yes. Pick "Private equity" in Blueprints to get the full deal lifecycle (origination → diligence → execution & close with IC + signing gates → value creation → exit), plus the cross-portfolio value-creation playbook as standardized levers (working capital, FP&A, pricing/margin, spend analytics, JML access) that deploy identically across every portfolio company. Human-approval gates are built into the deal-close and IC steps. On Ingest, choosing "Private equity" also offers starter templates — Deal Sourcing & Screening, DD Red-Flag Log, IC Memo & Approval, and 100-Day & Value-Creation Plan.
Why offload this process to tacitrun’s AI operating layer
tacitrun is built for exactly this handoff: a business team describes the process it already runs, and governed domain agents run it across the systems you have, under your IT’s approval, with every write waiting for a person until the agent has earned autonomy.
- Built from your procedure, not a vendor template
- Describe the process in plain English or hand over the SOP. tacitrun compiles it into a process graph and composes one domain agent per step, so the agents carry your rules, your exceptions and your vocabulary.
- Tested against the process before it can act
- Evaluation cases are derived from the graph itself, so a passing agent is one that does what your process says. Then it runs in shadow beside your team on real work before anyone lets it act.
- Every write stops for a person until autonomy is earned
- The approval gate sits on the actual call to Salesforce, Shopify, SendGrid, SAP or any connected system. A person accepts, modifies or rejects; the corrected version is what executes; the trace keeps the record.
- Runs across the systems you already have
- Built-in connectors, your own REST APIs or MCP servers, and, as a custom-priced Enterprise option, your own cloud project and your own models. The systems of record stay where they are; the layer does the work between them.
- IT approves, business leads
- Business users build and prove; IT connects the credentials, binds the fields and approves before anything goes live. Neither side inherits the other’s risk.
Read next
- What is an AI operating layer?
- How do AI agents improve operational efficiency without adding risk?
- Enterprise: hosted or in your cloud, gated by your IT
- AI agents for Retail operations
- AI agents for Consumer goods operations
- AI agents for Insurance — personal lines operations
- AI agents for Insurance — commercial lines operations