Estimating & bid
Bid / ITB intake & qualification
Capture an invitation to bid — scope, site, schedule, spec references, bond and insurance requirements — and decide whether to pursue it.
- Inputs
- Invitation to bid · Drawings & specifications · Prequalification requirements
- Outputs
- Structured bid record · Bid / no-bid recommendation with reasons
- KPIs it moves
- Bid response time · Bid / no-bid accuracy · Win rate
- Systems it usually runs on
- Estimating system · Document store · CRM
- Where a person stays in the loop
- Bid / no-bid decision
Vendor & subcontractor quote normalization
Turn unstructured vendor and subcontractor quotes into one comparable cost matrix, line by line across equipment, material, labor, freight and contingency, and name the scope each quote excludes.
- Inputs
- Vendor & subcontractor quotes · Bid package scope
- Outputs
- Normalized cost matrix · Scope gaps and exclusions
- KPIs it moves
- Quotes normalized per bid · Scope-gap detection rate · Analyst hours per bid
- Systems it usually runs on
- Estimating system · Document store · Email
- Where a person stays in the loop
- Scope-gap interpretation
Technical compliance check against specification
Cross-reference quoted items against the governing engineering specification and flag deviations in material grade, tolerance, pressure rating or code compliance.
- Inputs
- Normalized cost matrix · Engineering specifications · Applicable codes & standards
- Outputs
- Compliance-checked matrix · Deviation list with spec citations
- KPIs it moves
- Deviations caught before award · Spec citation coverage
- Systems it usually runs on
- Document store · Engineering specification library
- Where a person stays in the loop
- Deviation acceptance
Estimate preparation
Build the estimate from scope: labor hours and crew mix by discipline, material take-off, equipment, subcontract and indirects, priced to cost codes.
- Inputs
- Scope & drawings · Historical productivity rates · Labor rates · Material pricing
- Outputs
- Priced estimate by cost code · Assumptions & exclusions register
- KPIs it moves
- Estimate cycle time · Estimate accuracy vs final cost · Margin at bid
- Systems it usually runs on
- Estimating system · ERP / job cost
- Where a person stays in the loop
- Final pricing and margin approval
Proposal & bid submission assembly
Assemble the technical and commercial proposal from the approved estimate — scope narrative, clarifications and exclusions, qualifications, schedule, bid bond and required forms — and check it against every submission requirement in the invitation before it goes out.
- Inputs
- Approved estimate · Invitation to bid & addenda · Clarifications & exclusions · Company qualifications
- Outputs
- Submission-ready proposal · Compliance matrix against the ITB · Addenda acknowledgement
- KPIs it moves
- Submissions compliant first time · Proposal preparation hours · Addenda missed
- Systems it usually runs on
- Estimating system · Document store · E-signature · Email
- Where a person stays in the loop
- Final price and exclusions sign-off · Submission release
Engineering & design
Engineering deliverables register & progress
Keep the master deliverables list — every drawing, datasheet, calculation and specification by discipline — with its revision, status and planned versus actual issue dates, and roll it into engineering percent complete and the deliverables that put procurement or construction at risk.
- Inputs
- Master deliverables list · Document register · Engineering schedule · Discipline progress rules of credit
- Outputs
- Deliverables status by discipline · Engineering percent complete · Late deliverables with downstream impact
- KPIs it moves
- Deliverables issued on plan · Engineering progress vs plan · Deliverables holding up procurement
- Systems it usually runs on
- Engineering document management (EDMS) · Document store · Scheduling system
- Where a person stays in the loop
- Re-baselining a deliverable date
Design review & interdisciplinary check
Route a deliverable through the interdisciplinary check, collect each discipline’s comments against the design basis and the latest revisions of interfacing documents, and track every comment to a recorded resolution before the deliverable is issued.
- Inputs
- Deliverable for review · Design basis · Interfacing deliverables (latest revision)
- Outputs
- Consolidated comment register · Resolution status per comment · Issue-ready deliverable
- KPIs it moves
- Review cycle time · Comments closed before issue · Interface clashes found after issue
- Systems it usually runs on
- Engineering document management (EDMS) · Document store
- Where a person stays in the loop
- Comment rejection or deferral · Approval to issue for construction
Engineering calculation checking
Check a calculation package against its stated design basis, inputs and governing code clauses — load cases, units, assumptions, referenced revisions — and record what the independent checker must look at, without ever signing the check itself.
- Inputs
- Calculation package · Design basis · Applicable codes & standards
- Outputs
- Check findings with code citations · Input and revision mismatches · Checker sign-off record
- KPIs it moves
- Calculations checked before issue · Errors caught at check · Check turnaround time
- Systems it usually runs on
- Engineering document management (EDMS) · Engineering specification library
- Where a person stays in the loop
- Independent checker sign-off — always a qualified engineer
Design change notice management
Capture an internal design change — from a field condition, vendor data, client comment or engineering error — identify every deliverable, purchase order and work package it touches, and track the revisions through to reissue and the cost or schedule impact to change control.
- Inputs
- Change trigger (RFI answer, vendor data, field query) · Deliverables register · Purchase orders · Work packages
- Outputs
- Design change notice · Impacted deliverables and orders · Impact handed to change control
- KPIs it moves
- Design changes with complete impact list · Change-to-reissue cycle time · Rework from late design changes
- Systems it usually runs on
- Engineering document management (EDMS) · ERP · Project management system
- Where a person stays in the loop
- Design change approval by the responsible engineer · Decision whether the change is client-chargeable
Vendor document review
Take in supplier drawings, datasheets and procedures due under each purchase order, track them against the vendor document schedule, route them to the right discipline reviewer, and return them with a review code before the late ones hold up fabrication.
- Inputs
- Vendor document schedule per PO · Supplier submissions · Purchase order technical requirements
- Outputs
- Review code per document (approved / approved with comments / rejected) · Overdue vendor documents · Comments returned to supplier
- KPIs it moves
- Vendor documents reviewed within contract days · Overdue vendor documents · Resubmission rate
- Systems it usually runs on
- Engineering document management (EDMS) · Vendor portals · Email
- Where a person stays in the loop
- Review code assignment by the discipline engineer
Project controls
Change-order identification & pricing
Detect scope changes from field reports, RFIs and correspondence, price them against contract rates, and prepare the change order for submission.
- Inputs
- Daily field reports · RFIs · Contract rates & terms · Original scope
- Outputs
- Change-order package with backup · Unbilled-scope exposure
- KPIs it moves
- Change orders captured vs absorbed · Days from change to submission · Approval rate
- Systems it usually runs on
- Project management system · ERP / job cost
- Where a person stays in the loop
- Change-order submission to the client
Estimate vs actual variance by cost code
Compare booked hours and cost against the estimate at cost-code level, identify whether the driver is scope, productivity or coding, and say so plainly when no driver is established.
- Inputs
- Estimate by cost code · Actual labor & cost postings · Installed quantities
- Outputs
- Variance report with narrative · Drivers classified or marked unexplained
- KPIs it moves
- Cost-code variance · Hours per unit installed · Share of variance explained
- Systems it usually runs on
- ERP / job cost · Estimating system
- Where a person stays in the loop
- Rate changes carried into future estimates
Progress measurement & forecast at completion
Roll up installed quantities and earned progress into percent complete by cost code and produce a forecast at completion, stating what changed since the last forecast.
- Inputs
- Installed quantities · Budget by cost code · Committed and incurred cost
- Outputs
- Percent complete by cost code · Forecast at completion with movement
- KPIs it moves
- Forecast accuracy · Schedule variance · Cost variance
- Systems it usually runs on
- ERP / job cost · Scheduling system
- Where a person stays in the loop
- Forecast issued to the client or to management
Progress billing & backup assembly
Prepare the periodic progress application from measured progress and approved change orders, and assemble the backup the contract requires.
- Inputs
- Percent complete · Approved change orders · Contract billing terms
- Outputs
- Draft progress application with backup · Unbilled exposure
- KPIs it moves
- Days to submit · Rejection / resubmission rate · Unbilled balance
- Systems it usually runs on
- ERP / job cost · Project management system
- Where a person stays in the loop
- Application submitted to the client
Estimate-to-budget handover & control budget
Turn the awarded estimate into the control budget — cost breakdown structure, cost codes, quantities and labor units, contingency and management reserve — load it to job cost, and reconcile the budget total to the contract value.
- Inputs
- Awarded estimate · Contract value & schedule of values · Company cost-code library
- Outputs
- Control budget by cost code · Schedule of values · Budget-to-contract reconciliation
- KPIs it moves
- Days from award to loaded budget · Budget lines without a cost code · Budget-to-contract variance
- Systems it usually runs on
- ERP / job cost · Estimating system
- Where a person stays in the loop
- Control budget approval · Contingency allocation
Schedule update & delay analysis
Status the CPM schedule from progress and field reports, recalculate the critical path, compare it with the baseline and the last update, and draft the delay analysis — which activities slipped, why, and whether the cause is ours, the client’s or neutral.
- Inputs
- Baseline & current schedule · Progress and daily reports · RFI, submittal and delivery status
- Outputs
- Updated schedule · Critical-path change narrative · Draft delay analysis with cause attribution
- KPIs it moves
- Schedule updated on cycle · Float consumed on the critical path · Delay events with documented cause
- Systems it usually runs on
- Scheduling system · Project management system · Field mobile app
- Where a person stays in the loop
- Schedule update issued to the client · Cause attribution of a delay
Project risk register & contingency drawdown
Keep the project risk register current from RFIs, change events, schedule slips and field reports — likelihood, impact, owner and mitigation — and reconcile contingency drawdown against the risks that actually materialised.
- Inputs
- Risk register · Change events · Schedule and cost forecasts · Contingency log
- Outputs
- Updated risk register · New and escalating risks · Contingency drawdown reconciliation
- KPIs it moves
- Risks with an active mitigation · Contingency remaining vs open risk exposure · Unforeseen cost events
- Systems it usually runs on
- Project management system · ERP / job cost · Reporting
- Where a person stays in the loop
- Contingency drawdown approval · Risk acceptance
WIP report, over/under billing & cash-flow forecast
Produce the work-in-progress schedule for every job — percent complete on cost, earned revenue, billed to date, over or under billing — and the cash-flow forecast from billing, retainage and committed cost, flagging the jobs that are financing the client.
- Inputs
- Job cost to date · Estimated cost at completion · Billings and retainage · Committed cost
- Outputs
- WIP schedule · Over/under billing by job · Cash-flow forecast
- KPIs it moves
- Under-billing as % of revenue · Fade / gain on margin · Cash-flow forecast accuracy
- Systems it usually runs on
- ERP / job cost · Reporting
- Where a person stays in the loop
- WIP sign-off for the financial close · Margin fade write-down
Owner / monthly progress report
Assemble the periodic progress report the contract requires — progress against plan, schedule, cost and change status, safety statistics, look-ahead and key issues — from the records already in the project, and list what is still missing before it can go to the client.
- Inputs
- Progress and forecast · Schedule update · Change and RFI logs · Safety statistics
- Outputs
- Draft progress report · Missing-input list
- KPIs it moves
- Report issued on contract date · Preparation hours per report · Client queries on report figures
- Systems it usually runs on
- Project management system · Reporting · Document store
- Where a person stays in the loop
- Release to the client
Meeting minutes & action tracking
Turn project meeting notes or recordings — progress, coordination, safety, client meetings — into minutes and an action log with owners and due dates, chase overdue actions, and link each action to the RFI, change or risk it belongs to.
- Inputs
- Meeting notes or transcript · Attendee list · Open action log
- Outputs
- Draft minutes · Action log with owners and dates · Overdue action reminders
- KPIs it moves
- Minutes issued within 48 hours · Actions closed by due date · Actions without an owner
- Systems it usually runs on
- Collaboration (Teams / Slack) · Document store · Email
- Where a person stays in the loop
- Minutes release to external parties
Contracts & commercial
Prime contract risk review
Review the client contract before signature for the clauses that move risk to the contractor — liquidated damages, consequential damages, indemnities, pay-when-paid, notice periods, warranty, limitation of liability — compare them with the company’s position, and list each deviation with its exposure.
- Inputs
- Draft client contract · Company contracting positions · Bid assumptions
- Outputs
- Clause-by-clause deviation list · Exposure summary · Notice-period obligations register
- KPIs it moves
- Contracts reviewed before signature · High-risk clauses accepted without mitigation · Review turnaround
- Systems it usually runs on
- Contract management · Document store · E-signature
- Where a person stays in the loop
- Acceptance of any deviation from company position — always legal or commercial lead
Subcontractor pay application, retainage & lien waivers
Check each subcontractor pay application against verified progress and the schedule of values, apply retainage, require the conditional and unconditional lien waivers the contract calls for, and hold payment where compliance or waivers are missing.
- Inputs
- Subcontractor pay application · Verified progress · Subcontract schedule of values · Lien waivers · Compliance status
- Outputs
- Approved pay amount with retainage · Missing waiver or compliance holds · Payment release record
- KPIs it moves
- Pay applications processed within terms · Overbilling caught · Payments released without a valid waiver
- Systems it usually runs on
- ERP / job cost · Compliance tracking · Document store
- Where a person stays in the loop
- Pay application approval · Release of retainage
Contract notices, claims & disputes
Watch correspondence, delay events and change disputes for anything that triggers a contractual notice, track the notice deadline, draft the notice and assemble the entitlement and quantum record for a claim.
- Inputs
- Contract notice obligations · Correspondence · Delay analysis · Disputed change orders
- Outputs
- Notice deadline register · Draft notices · Claim file with entitlement and quantum backup
- KPIs it moves
- Notices issued within contract periods · Entitlement lost to missed notice · Claim value recovered
- Systems it usually runs on
- Contract management · Document store · Email · Scheduling system
- Where a person stays in the loop
- Any notice or claim sent to the client — never automatic
Subcontractor backcharges
Record the cost the company incurred for a subcontractor’s defective, incomplete or late work — labor, material, equipment and supervision — with the notice and evidence the subcontract requires, and recover it against the subcontractor’s next payment.
- Inputs
- Field and QA records of the deficiency · Cost incurred · Subcontract backcharge terms
- Outputs
- Backcharge notice with evidence · Deduction against subcontractor payment
- KPIs it moves
- Backcharges recovered · Backcharges disputed · Days from event to notice
- Systems it usually runs on
- ERP / job cost · Field mobile app · Document store
- Where a person stays in the loop
- Backcharge issue to the subcontractor
Engineering & document control
Drawing & submittal intake
Take in drawings, data sheets and submittals, register them with revision and status, and extract the tags, line items and quantities the downstream processes need.
- Inputs
- Drawings & data sheets (text-extractable) · Transmittals · Revision register
- Outputs
- Registered documents with revision status · Extracted tags & quantities
- KPIs it moves
- Intake turnaround · Superseded-revision incidents · Extraction coverage
- Systems it usually runs on
- Document store · Project management system
- Where a person stays in the loop
- Acceptance of an extraction with low confidence
Bill of materials generation & standardization
Turn extracted drawing content into a standardized bill of materials with consistent units, descriptions and part identifiers.
- Inputs
- Extracted drawing content · Parts & materials standards
- Outputs
- Standardized bill of materials · Items needing clarification
- KPIs it moves
- Items standardized without rework · Clarification rate
- Systems it usually runs on
- Document store · ERP
- Where a person stays in the loop
- Resolution of an ambiguous or unmatched item
Request for information (RFI) management
Draft, route and track RFIs to the engineer or client, chase the ones that are ageing, and connect the answer back to the scope and cost it affects.
- Inputs
- Field question or discrepancy · Drawings & specifications · Contract correspondence terms
- Outputs
- Drafted RFI · Ageing / overdue RFI list · Answer linked to affected scope
- KPIs it moves
- RFI response time · Open RFIs ageing past terms · RFIs leading to change orders
- Systems it usually runs on
- Project management system · Document store · Email
- Where a person stays in the loop
- RFI issued to the engineer or client
Submittal & transmittal tracking
Track submittals through review and approval against the schedule, and flag the ones whose approval date puts procurement or fabrication at risk.
- Inputs
- Submittal register · Review status · Project schedule
- Outputs
- Submittal status view · Approvals at risk of delaying work
- KPIs it moves
- Submittal cycle time · Rejections requiring resubmission · Approvals late against need date
- Systems it usually runs on
- Project management system · Document store
- Where a person stays in the loop
- Escalation of an approval that will delay work
Procurement & materials
Material reconciliation & requisition
Reconcile required materials against stock and commitments, flag long-lead items against the schedule, and prepare purchase requisitions for the shortfall.
- Inputs
- Bill of materials · Inventory on hand · Open commitments · Lead times & schedule
- Outputs
- Reconciliation matrix · Draft purchase requisitions · Long-lead exposure
- KPIs it moves
- Shortfalls found before work starts · Long-lead items flagged in time · Requisition cycle time
- Systems it usually runs on
- ERP · Inventory / warehouse system
- Where a person stays in the loop
- Purchase requisition release
Expediting & delivery tracking
Track purchase orders against their promised dates, chase the ones that threaten a work front, and give the field a straight answer on when material lands.
- Inputs
- Open purchase orders · Promised & confirmed dates · Work-front need dates
- Outputs
- Expediting list ranked by impact · Revised delivery outlook
- KPIs it moves
- On-time delivery rate · Work fronts delayed by material · Days recovered by expediting
- Systems it usually runs on
- ERP · Vendor portals · Email
- Where a person stays in the loop
- Commitment made to a vendor or to the field
Receiving & material verification
Verify received material against the purchase order and the specification, capture heat numbers and certificates at receipt, and record shortages or damage before the material is used.
- Inputs
- Purchase order · Packing list · Specification · Material certificates
- Outputs
- Receipt record with certificate linkage · Shortage / damage / non-conformance report
- KPIs it moves
- Receipts verified before issue · Certificates captured at receipt · Non-conformances found at receipt
- Systems it usually runs on
- ERP · Inventory / warehouse system · Document store
- Where a person stays in the loop
- Acceptance of material with a discrepancy
Subcontract administration & compliance
Keep subcontractor agreements, insurance certificates and compliance evidence current, and reconcile subcontractor invoices against the work actually performed.
- Inputs
- Subcontract agreements · Insurance certificates · Subcontractor invoices · Field records of work performed
- Outputs
- Compliance status by subcontractor · Invoice reconciliation with exceptions
- KPIs it moves
- Subcontractors compliant at time of work · Expiring evidence · Invoice exceptions found
- Systems it usually runs on
- ERP · Document store · Compliance tracking
- Where a person stays in the loop
- Approval of a subcontractor invoice or a compliance exception
Buyout & subcontract / purchase award
After award, buy out the job package by package — re-level the final quotes, confirm scope and exclusions against the control budget, draft the subcontract or purchase order, and track buyout savings or losses per package.
- Inputs
- Control budget · Final vendor & subcontractor quotes · Package scope
- Outputs
- Award recommendation per package · Draft subcontract / purchase order · Buyout savings log
- KPIs it moves
- Packages bought out on schedule · Buyout savings vs budget · Scope gaps found after award
- Systems it usually runs on
- ERP · Estimating system · Contract management
- Where a person stays in the loop
- Award decision · Subcontract execution
Field operations
Daily field report capture & rollup
Capture the daily report from each crew — work performed, quantities, manpower, equipment, weather, delays and visitors — and roll it into a project view that flags what needs a decision.
- Inputs
- Crew daily reports · Installed quantities · Site conditions
- Outputs
- Consolidated daily report · Delays and issues needing a decision
- KPIs it moves
- Reports submitted on time · Quantities captured daily · Delay events documented
- Systems it usually runs on
- Field mobile app · Project management system
- Where a person stays in the loop
- Delay or disruption notice sent to the client
Work order intake, dispatch & completion
Take a work request from the client or the field, scope it, dispatch it to a crew with the right craft and certifications, and close it out with the records the contract requires.
- Inputs
- Work request · Crew availability & certifications · Site access requirements
- Outputs
- Dispatched work order · Completion record with evidence
- KPIs it moves
- Time to dispatch · First-visit completion rate · Backlog age
- Systems it usually runs on
- Work management system · Scheduling system · Field mobile app
- Where a person stays in the loop
- Dispatch of work requiring a permit or client access
Field material request & issue
Take material requests from the field, check them against what is issued and available, and route the shortfall to procurement without stopping the work front.
- Inputs
- Field material request · Issued material records · Inventory on hand
- Outputs
- Issue instruction or shortfall routed to procurement · Work-front impact
- KPIs it moves
- Requests fulfilled from stock · Work fronts idled for material · Request turnaround
- Systems it usually runs on
- Inventory / warehouse system · ERP · Field mobile app
- Where a person stays in the loop
- Substitution of a specified material
Look-ahead planning & constraint removal
Build the three-to-six-week look-ahead from the schedule and check each activity’s constraints — drawings, RFIs, material, permits, access, crews and equipment — so the work released to the field is actually ready to start.
- Inputs
- Schedule · RFI, submittal and delivery status · Crew and equipment plans · Permits
- Outputs
- Look-ahead plan · Constraint log with owners · Ready-to-start work list
- KPIs it moves
- Percent plan complete · Activities started with an open constraint · Constraints cleared before need date
- Systems it usually runs on
- Scheduling system · Project management system · Field mobile app
- Where a person stays in the loop
- Release of the weekly work plan
Equipment & fleet utilisation
Track owned and rented equipment by job — hours from telematics or timesheets, idle days, rental off-rent dates and maintenance due — call off idle rentals, flag equipment overdue for service or inspection, and charge equipment cost to the right cost code.
- Inputs
- Equipment list & rental agreements · Telematics or equipment hours · Maintenance schedules
- Outputs
- Utilisation by unit and job · Idle rentals to call off · Overdue service and inspections · Equipment cost by cost code
- KPIs it moves
- Equipment utilisation · Idle rental cost · Equipment downtime
- Systems it usually runs on
- Equipment / telematics system · ERP / job cost · Field mobile app
- Where a person stays in the loop
- Off-rent call · Removing a unit from service
Punch list management
Capture punch items from walkdowns with location, trade and photo, assign each to the responsible crew or subcontractor, chase closure, and report what stands between each area or system and acceptance.
- Inputs
- Walkdown findings · Responsible trade per area · Acceptance criteria
- Outputs
- Punch list by area, system and trade · Overdue items · Areas ready for acceptance
- KPIs it moves
- Punch items closed per week · Items reopened after closure · Days from mechanical completion to punch-free
- Systems it usually runs on
- Field mobile app · Project management system · QA/QC system
- Where a person stays in the loop
- Item closure verification · Area acceptance
Workforce, time & labor integrity
Field time capture & approval
Collect crew hours from the field against project and cost code, validate them against the schedule and approve them into payroll and job cost.
- Inputs
- Crew timesheets · Project & cost-code structure · Shift schedule
- Outputs
- Approved time by project and cost code · Coding corrections
- KPIs it moves
- Time submitted on schedule · Correction rate · Payroll rework hours
- Systems it usually runs on
- Time capture app · ERP / job cost · Payroll
- Where a person stays in the loop
- Timesheet approval · Cost-code reassignment
Labor time exception & integrity review
Review submitted time for exceptions that indicate error or abuse — overlapping entries, hours inconsistent with site presence, repeated round-number entries, cost-code drift, duplicate submissions, and hours booked against scope already complete — and route each exception to a supervisor with its evidence.
- Inputs
- Submitted timesheets · Site presence / badge data · Cost-code structure · Progress by scope
- Outputs
- Ranked exception queue with evidence · Supervisor decisions and dispositions
- KPIs it moves
- Exceptions per thousand hours · Confirmed-exception rate · Recovered labor cost · False-positive rate
- Systems it usually runs on
- Time capture app · ERP / job cost · Access control / badge system
- Where a person stays in the loop
- Every exception disposition — an exception is a question for a supervisor, never an accusation
Certification & hours-of-service compliance
Track craft certifications and required training against upcoming assignments, and verify hours-of-service limits before a worker is scheduled.
- Inputs
- Worker certifications & expiry dates · Assignment schedule · Hours worked
- Outputs
- Expiring-certification alerts · Assignment eligibility decisions
- KPIs it moves
- Expired-certification incidents · Assignments blocked for eligibility · Renewal lead time
- Systems it usually runs on
- HR system · Training records · Scheduling system
- Where a person stays in the loop
- Assignment of a worker with a lapsed or pending certification
Crew scheduling & dispatch
Assign crews to projects and shifts by craft, certification and availability, and escalate the coverage gaps rather than forcing a fill.
- Inputs
- Project labor demand · Crew availability · Certification status · Site requirements
- Outputs
- Dispatch plan · Coverage gaps escalated
- KPIs it moves
- Coverage rate · Unfilled shifts · Travel & per-diem cost
- Systems it usually runs on
- Scheduling system · HR system
- Where a person stays in the loop
- Dispatch publication · Overtime authorization
Labor utilisation & productivity reporting
Roll up hours, utilisation and installed quantities into a productivity view by project, crew and cost code, and narrate what moved.
- Inputs
- Approved time · Installed quantities · Estimate rates
- Outputs
- Productivity report with narrative · Underperforming cost codes
- KPIs it moves
- Hours per unit installed · Utilisation rate · Overtime share
- Systems it usually runs on
- ERP / job cost · Reporting
- Where a person stays in the loop
- External or client-facing distribution
Certified payroll & prevailing wage compliance
Prepare certified payroll reports for public or prevailing-wage work — classification, rate, fringe and hours per worker per week — check them against the wage determination and apprentice ratios, and collect the same reports from subcontractors before they are paid.
- Inputs
- Approved time by worker and classification · Wage determination · Fringe benefit records · Subcontractor certified payrolls
- Outputs
- Certified payroll report · Rate and ratio exceptions · Missing subcontractor reports
- KPIs it moves
- Reports submitted on time · Wage underpayments found before submission · Subcontractors missing reports
- Systems it usually runs on
- Payroll · Time capture app · Compliance tracking
- Where a person stays in the loop
- Signed statement of compliance · Restitution for an underpayment
Safety & HSE
Safe-work policy grounding
Answer field questions about safe work practice strictly from the company HSE manual and the applicable regulation, citing the passage — and say plainly when the policy does not cover the case rather than inventing a procedure.
- Inputs
- HSE policy manual · Applicable regulations & standards · Field question
- Outputs
- Cited answer · Gap flagged where policy is silent
- KPIs it moves
- Citation coverage · Unanswered / escalated rate · Policy gaps identified
- Systems it usually runs on
- Document store · HSE policy library
- Where a person stays in the loop
- Any answer that would change or extend written policy
Job safety analysis & pre-task plan review
Review submitted JSAs and pre-task plans against the task, the site hazards and the governing standard, and return the gaps to the field lead before work starts.
- Inputs
- Submitted JSA / pre-task plan · Task & site description · Hazard standards
- Outputs
- Review with gaps and required controls · Approved plan
- KPIs it moves
- JSAs reviewed before task start · Gap rate · Review turnaround time
- Systems it usually runs on
- Field mobile app · HSE policy library
- Where a person stays in the loop
- Approval to proceed with the task
Permit-to-work & isolation verification
Verify that the permit, lockout/tagout isolation and hot-work requirements for a task are complete, current and signed before work is released.
- Inputs
- Permit request · Isolation / LOTO records · Task & equipment detail
- Outputs
- Verification result with missing items · Released permit
- KPIs it moves
- Permits verified before release · Missing-item rate · Permit cycle time
- Systems it usually runs on
- Permit system · Field mobile app
- Where a person stays in the loop
- Permit release
Incident & near-miss intake and reporting
Take an incident or near-miss report from the field, assemble the facts, assess recordability against the regulation, and draft the report and corrective actions for HSE review.
- Inputs
- Field incident report · Witness statements · Recordability criteria · HSE policy
- Outputs
- Structured incident record · Draft regulatory report · Corrective actions
- KPIs it moves
- Time to first report · Recordability determination accuracy · Corrective actions closed on time
- Systems it usually runs on
- HSE / EHS system · Document store
- Where a person stays in the loop
- Recordability determination and any regulatory filing — filings are drafted, never submitted automatically
Safety observation rollup & leading indicators
Aggregate safety observations, toolbox talks and near misses into leading-indicator trends by site and crew, and surface where exposure is rising before it becomes an incident.
- Inputs
- Safety observations · Toolbox talk records · Near-miss reports · Hours worked
- Outputs
- Leading-indicator trend view · Sites and crews trending adversely
- KPIs it moves
- Observations per hours worked · Near-miss to incident ratio · Close-out time
- Systems it usually runs on
- HSE / EHS system · Reporting
- Where a person stays in the loop
- Client-facing or executive distribution
Contractor prequalification evidence pack
Assemble and keep current the safety and compliance evidence that client prequalification programmes require — incident rates, insurance, training records, written programmes — and flag what is expiring before it costs a bid.
- Inputs
- Incident rate history · Insurance certificates · Training records · Written HSE programmes
- Outputs
- Prequalification submission pack · Expiring-evidence alerts
- KPIs it moves
- Prequalification status by client · Evidence expiring within 30 days · Submission turnaround
- Systems it usually runs on
- Prequalification portals · HSE / EHS system · Document store
- Where a person stays in the loop
- Submission to a client or prequalification portal
Environmental compliance & stormwater
Keep the site environmental obligations current — stormwater pollution prevention inspections after rain events, erosion controls, dust and noise limits, waste and hazardous-material manifests — and flag the missed inspection or permit condition before a regulator does.
- Inputs
- Environmental permits & plans · Rainfall data · Inspection records · Waste manifests
- Outputs
- Inspection schedule and record · Corrective actions · Permit condition exceptions
- KPIs it moves
- Required inspections completed on time · Corrective actions closed on time · Environmental notices of violation
- Systems it usually runs on
- HSE / EHS system · Field mobile app · Document store
- Where a person stays in the loop
- Any report or notification to a regulator — drafted, never filed automatically
Fabrication & QA/QC
Weld log & NDT reconciliation
Compile weld logs with their non-destructive testing results, reconcile them by weld identifier against welder qualifications, and surface welds that are untested, failed or missing an inspector record.
- Inputs
- Weld logs · NDT laboratory reports · Welder qualification records
- Outputs
- Reconciled weld register · Untested / failed / unsigned welds
- KPIs it moves
- Weld repair rate · NDT coverage · Reconciliation time per package
- Systems it usually runs on
- Fabrication / shop system · Document store
- Where a person stays in the loop
- Disposition of a failed or unsigned weld
Material traceability — heats to mill certificates
Match heat numbers on received and installed material to the mill test reports that certify them, check the certified properties against the specification, and flag material that cannot be traced.
- Inputs
- Heat numbers · Mill test reports · Material receiving records · Specification requirements
- Outputs
- Traceability matrix · Untraceable or non-conforming material
- KPIs it moves
- Traceability coverage · Untraceable material found · Time to resolve a traceability gap
- Systems it usually runs on
- Fabrication / shop system · Document store · ERP
- Where a person stays in the loop
- Acceptance of material with an incomplete certificate
Inspection, test & calibration records
Track the inspection and test plan, instrument calibration validity and commissioning sign-offs through to system acceptance, and flag records that are missing or expired.
- Inputs
- Inspection & test plan · Calibration certificates · Commissioning checklists
- Outputs
- Records status by system · Missing or expired records
- KPIs it moves
- Records complete at handover · Expired calibration incidents · Punch-list closure time
- Systems it usually runs on
- QA/QC system · Document store
- Where a person stays in the loop
- System acceptance sign-off
Turnover data book assembly
Assemble the client turnover package for a fabricated assembly or completed system — weld register, NDT results, material certificates, inspection and test records, calibration certificates — and report exactly what is still outstanding.
- Inputs
- Weld register · NDT results · Mill certificates · Inspection & test records · Calibration certificates
- Outputs
- Turnover data book · Outstanding-document list
- KPIs it moves
- Package completeness at first submission · Assembly time per package · Client rejection rate
- Systems it usually runs on
- Document store · Fabrication / shop system
- Where a person stays in the loop
- Release of the package to the client
Non-conformance & corrective action
Record a non-conformance found in the shop or the field, route the disposition decision, and track the corrective action to closure.
- Inputs
- Non-conformance report · Specification & procedure · Affected scope
- Outputs
- Disposition decision with rationale · Corrective action tracked to closure
- KPIs it moves
- Time to disposition · Repeat non-conformances · Corrective actions closed on time
- Systems it usually runs on
- QA/QC system · Fabrication / shop system
- Where a person stays in the loop
- Disposition — repair, rework, use-as-is or scrap
Commissioning, handover & closeout
Mechanical completion & commissioning by system
Track every system from mechanical completion through pre-commissioning, commissioning and start-up — check sheets, punch status, loop checks and test records per system — and say exactly what remains before each system can be handed over.
- Inputs
- System and subsystem boundaries · Completion check sheets · Punch list · Test and loop-check records
- Outputs
- Completion status by system · Outstanding items per system · Handover-ready systems
- KPIs it moves
- Systems handed over on plan · Check sheets outstanding at handover · Start-up delays from incomplete records
- Systems it usually runs on
- QA/QC system · Project management system · Document store
- Where a person stays in the loop
- Mechanical completion certificate · Ready-for-start-up sign-off
As-built drawings & record documents
Collect field redlines and approved changes against the issued drawings, track each drawing to its as-built revision, and report which record documents are still outstanding for handover.
- Inputs
- Field redlines · Design changes and RFI answers · Issued-for-construction drawings
- Outputs
- As-built register · Drawings awaiting incorporation · Record document package
- KPIs it moves
- As-builts complete at handover · Redlines older than 30 days · Client rejections of record documents
- Systems it usually runs on
- Engineering document management (EDMS) · Document store · Field mobile app
- Where a person stays in the loop
- As-built certification to the client
Warranty & defects liability management
Log warranty and defects-liability claims from the client, check them against the warranty terms and the responsible subcontractor or supplier, dispatch the remedy, and track each claim and the warranty expiry dates to closure.
- Inputs
- Client warranty claim · Warranty terms and expiry dates · Responsible party per scope
- Outputs
- Warranty claim log · Dispatched remedy to the responsible party · Upcoming warranty expiries
- KPIs it moves
- Claims resolved within warranty terms · Warranty cost recovered from subcontractors · Repeat claims
- Systems it usually runs on
- Work management system · ERP / job cost · Document store
- Where a person stays in the loop
- Acceptance or rejection of a claim · Cost recovery from a subcontractor
Final account & project closeout
Drive the job to financial close — final billing and change-order settlement, retainage release, final lien waivers, open commitments and accruals closed, and the final cost reconciled against the control budget — and list what is blocking close.
- Inputs
- Final measured quantities · Change order log · Retainage held and owed · Open commitments
- Outputs
- Final account · Retainage release requests · Closeout blockers · Final cost report
- KPIs it moves
- Days from substantial completion to financial close · Retainage outstanding · Unsettled change orders at close
- Systems it usually runs on
- ERP / job cost · Document store · Compliance tracking
- Where a person stays in the loop
- Final account agreement with the client · Job close in the ledger
What a blueprint is, and is not
A blueprint supplies the vocabulary, the typical steps, the KPIs and the approval points for a process. It is a starting point, not a pre-built agent: tacitrun builds the domain agents by reading your own procedure, tests them against cases derived from it, runs them in shadow beside your team, and holds every write for a person until the agent has earned autonomy. Your IT connects the systems and approves before anything goes live.
Questions people ask
- How do I give an agent a reference document (e.g. a sample template) to use at runtime?
- Two places, both drag-and-drop: (1) for ONE agent, open it → Knowledge tab → drop the file on “Documents it can look up”; (2) for the WHOLE process (available to every agent in it), the process page has a “Documents for this process” card — drop it there. For example, drop a sample proposal template for a Proposal Generator. Whatever the format — PDF, Word, Excel, CSV, HTML, text, OR a screenshot/image (PNG, JPG, etc.) — we handle it: documents convert to clean markdown (tables and headings preserved, not a flattened blob), and images/screenshots are read by vision (Claude) which transcribes all the text and describes what’s in them (e.g. a screenshot of an invoice becomes a markdown table of its line items). Then we index it so agents find the right passage. It’s added immediately (no IT approval needed, nothing hardcoded) and shows in the document list. From then on the agent searches it live every run and uses it as a reference — e.g. it drafts new proposals in the shape of your template. To have it ALWAYS apply a rule instead of just look it up, use “Teach it” on the same tab (or the Rules tab for enforceable policies).
- What is the Salesforce Data Hygiene blueprint, and how do I use it?
- It’s a pre-built end-to-end process (a "crew" of 5 domain agents) that replaces the manual job of cleaning up messy CRM data and re-importing it. In the Catalog it shows as a Blueprint with the problem it solves, the outcomes it delivers, and the process mapped to each domain agent: (1) Data Quality Auditor profiles the object and reports duplicates/blanks/malformed/stale records; (2) Duplicate Finder & Merger proposes human-approved merges; (3) Field Standardizer normalizes phone/state/country/titles/casing; (4) Data Re-import Loader picks up a cleaned file (SFTP/SharePoint/Drive) and UPSERTS each row by external ID — so re-runs update the same record instead of creating duplicates; (5) Import Reconciliation Auditor verifies the load matched the source. Adopt each step from the blueprint; we build a private copy in your workspace that you can adapt, connected to your own Salesforce. Every write goes through human approval until you trust it.
- What’s a Skill vs a Blueprint?
- A Blueprint is a starter process template. A Skill is a reusable knowledge pack a domain agent loads on demand at runtime.
- Do you have blueprints for private equity / deal teams?
- Yes. Pick "Private equity" in Blueprints to get the full deal lifecycle (origination → diligence → execution & close with IC + signing gates → value creation → exit), plus the cross-portfolio value-creation playbook as standardized levers (working capital, FP&A, pricing/margin, spend analytics, JML access) that deploy identically across every portfolio company. Human-approval gates are built into the deal-close and IC steps. On Ingest, choosing "Private equity" also offers starter templates — Deal Sourcing & Screening, DD Red-Flag Log, IC Memo & Approval, and 100-Day & Value-Creation Plan.
Why offload this process to tacitrun’s AI operating layer
tacitrun is built for exactly this handoff: a business team describes the process it already runs, and governed domain agents run it across the systems you have, under your IT’s approval, with every write waiting for a person until the agent has earned autonomy.
- Built from your procedure, not a vendor template
- Describe the process in plain English or hand over the SOP. tacitrun compiles it into a process graph and composes one domain agent per step, so the agents carry your rules, your exceptions and your vocabulary.
- Tested against the process before it can act
- Evaluation cases are derived from the graph itself, so a passing agent is one that does what your process says. Then it runs in shadow beside your team on real work before anyone lets it act.
- Every write stops for a person until autonomy is earned
- The approval gate sits on the actual call to Salesforce, Shopify, SendGrid, SAP or any connected system. A person accepts, modifies or rejects; the corrected version is what executes; the trace keeps the record.
- Runs across the systems you already have
- Built-in connectors, your own REST APIs or MCP servers, and, as a custom-priced Enterprise option, your own cloud project and your own models. The systems of record stay where they are; the layer does the work between them.
- IT approves, business leads
- Business users build and prove; IT connects the credentials, binds the fields and approves before anything goes live. Neither side inherits the other’s risk.
Read next
- What is an AI operating layer?
- How do AI agents improve operational efficiency without adding risk?
- Enterprise: hosted or in your cloud, gated by your IT
- AI agents for Retail operations
- AI agents for Consumer goods operations
- AI agents for Manufacturing operations
- AI agents for Insurance — personal lines operations